永久性
脉冲控制
投资(军事)
经济
生产(经济)
边距(机器学习)
变分不等式
最佳停车
数理经济学
数学优化
现存分类群
微观经济学
数学
计量经济学
计算机科学
财务
政治
机器学习
生物
进化生物学
法学
政治学
心理治疗师
心理学
作者
Alain Bensoussan,Benoît Chevalier‐Roignant
出处
期刊:Operations Research
[Institute for Operations Research and the Management Sciences]
日期:2018-10-09
卷期号:67 (1): 33-57
被引量:42
标识
DOI:10.1287/opre.2018.1752
摘要
We consider a firm expanding its production capacity in stages under uncertainty. The firm decides on the investment times and the size of the investment lumps. This setting gives rise to an impulse control problem for which we derive a quasi-variational inequality that involves two state variables: a stochastic price process and a controlled capacity process. We provide a general verification theorem and construct an optimal two-dimensional (s,S)-type policy for a specific case. The firm “waits and sees” before investing until the perpetuity value of newly installed capacity exceeds the total opportunity cost by a sufficient margin. Our model generalizes extant models dealing with “the option to expand” capacity and makes predictions of both the optimal investment timing and the optimal scale of production.
科研通智能强力驱动
Strongly Powered by AbleSci AI