约束规划
计算机科学
数学优化
调度(生产过程)
资源限制
作业车间调度
约束满足
护士排班问题
约束(计算机辅助设计)
时间限制
水准点(测量)
地铁列车时刻表
分布式计算
流水车间调度
数学
随机规划
人工智能
几何学
大地测量学
地理
法学
政治学
操作系统
概率逻辑
出处
期刊:Journal of the Construction Division and Management
[American Society of Civil Engineers]
日期:2020-12-07
卷期号:147 (2)
被引量:25
标识
DOI:10.1061/(asce)co.1943-7862.0001990
摘要
This paper introduces a new practical scheduling problem called the resource-constrained project scheduling problem under multiple time constraints, which involves a duration constraint of activity, temporal constraint, and resource calendar constraint. The duration constraint of the activity exists widely in real-life projects, and it is first proposed as a resource-constrained project scheduling problem in this paper. We prove the defects of the traditional temporal constraint and improve it. The new problem combines three types of time constraints for the first time, which makes it closer to the actual scheduling problem. We developed a constraint programming optimization model for the new problem and used the IBM ILOG CPLEX-CP version 12.9.0 optimizer to solve it. Computational experiments are carried out to show that the CP optimizer is fast and provides a near-optimum solution to the new problem for projects with hundreds of activities within minutes compared to other metaheuristic methods. The results reported in this paper can be used as a benchmark for other researchers to compare and improve. The new problem contributes to developing a practical decision support system for resolving real-life constraints in projects.
科研通智能强力驱动
Strongly Powered by AbleSci AI