悬链线
受电弓
水准点(测量)
工程类
模拟
计算机科学
结构工程
机械工程
地理
大地测量学
作者
Stefano Bruni,Jorge Ambrósio,Alberto Carnicero López,Yong Hyeon Cho,Lars Finner,Mitsuru Ikeda,Sam Young Kwon,Jean-Pierre Massat,Sebastian Stichel,Manuel Tur,Weihua Zhang
标识
DOI:10.1080/00423114.2014.953183
摘要
This paper describes the results of a voluntary benchmark initiative concerning the simulation of pantograph–catenary interaction, which was proposed and coordinated by Politecnico di Milano and participated by 10 research institutions established in 9 different countries across Europe and Asia. The aims of the benchmark are to assess the dispersion of results on the same simulation study cases, to demonstrate the accuracy of numerical methodologies and simulation models and to identify the best suited modelling approaches to study pantograph–catenary interaction. One static and three dynamic simulation cases were defined for a non-existing but realistic high-speed pantograph–catenary couple. These cases were run using 10 of the major simulation codes presently in use for the study of pantograph–catenary interaction, and the results are presented and critically discussed here. All input data required to run the study cases are also provided, allowing the use of this benchmark as a term of comparison for other simulation codes.
科研通智能强力驱动
Strongly Powered by AbleSci AI