Chifeng thermal power plant circulating fluidized bed boiler desulfurization system after repeated after the transformation,to achieve environmental protection desulfurization,this paper analyzes and summarizes the problems,improve the desulfurization performance and desulfurization of circulating fluidized bed boiler equipment.