The principle of the synchronizing device of the Shisanling Pumped Storage Power Station and the characteristics of synchronous connection of the units are briefly described.The problems found in the synchronizing process are introduced in detail.Mainly analyzed are some technical problems which have existed for many years,such as synchronization delay or failure,and big close angle under synchronous pump work condition.Corresponding solutions,such as adjusting governor parameters and adopting synchronizing device with two sets of parameters are put forward to shorten the synchronizing time and solve the problem of big close angle.These measures are proved valid in practice.