计算机科学
电磁线圈
工程类
数学优化
制造工程
算法
生产(经济)
可靠性工程
工业工程
运筹学
制造业
优化算法
业务
工程制图
作者
Qingyang Wang,Ying Meng,Lixin Tang,Jiyin Liu
标识
DOI:10.1080/00207543.2026.2671980
摘要
In the steel industry, coil reallocation is commonly adopted to ensure on-time delivery by reallocating coils to orders approaching their delivery dates, thereby satisfying customer requirements in terms of quantity and specifications. In real-world operations, coils belonging to the same order should be delivered together to the customer. To save logistics costs, it is important to shorten the total distance among the storage positions of the coils belonging to the same order and to reduce the hoisting operations. Different from existing studies that primarily focus on minimising the mismatching cost, this paper investigates a new steel coil reallocation problem with consideration of logistics costs (CRPL). For the problem, we formulate an integer programming model and develop an exact branch-and-price (B&P) algorithm to obtain optimal allocation schemes. An effective labelling method is designed to optimally solve the pricing problem, and a learning-based branching strategy is introduced to accelerate the solution process. We validate the performance of the proposed algorithm through computational experiments on real-world problem instances and randomly generated instances. The experiment results show that our algorithm is effective in solving large-scale instances with up to 600 coils and that the proposed acceleration strategies substantially improve computational efficiency.
科研通智能强力驱动
Strongly Powered by AbleSci AI