This report documents the electrical tests performed on the Semikron high-voltage automotive integrated power module (AIPM) at the Oak Ridge National Laboratory (ORNL). Testing was performed with an inductive/resistive load and with a motor load at the National Transportation Research Center (NTRC) during the second quarter of FY 2005.