Jyh‐Bin Yang,Tzu-Hua Lai
标识
DOI:10.1108/ecam-02-2023-0115
摘要
Purpose This study aims to review earned value management (EVM)-relative methods, including the original EVM, earned schedule method (ESM) and earned duration management (EDM(t)). This study then proposes a general implementation procedure and some basic principles for the selection of EVM-relative methods. Design/methodology/approach After completing an intensive literature review, this study conducts a case study to examine the forecasting performance of project duration using the EVM, ESM and EDM(t) methods. Findings When the project is expected to finish on time, ESM with a performance factor equal to 1 is the recommended method. EDM(t) would be the most reliable method during a project's entire lifetime if EDM(t) is expected to be delayed based on past experience. Research limitations/implications As this research conducts a case study with only one building construction project, the results might not hold true for all types of construction projects. Practical implications EVM, ESM and EDM(t) are simple and data-accessible methods. With the help of a general implementation procedure, applying all three methods would be better. The power of the three methods is definitely larger than that of choosing only one for complex construction projects. Originality/value Previous studies have discussed the advantages and disadvantages of EVM, ESM and EDM(t). This study amends the available outcomes. Thus, for schedulers or researchers interested in implementing EVM, ESM and EDM(t), this study can provide more constructive instructions.
科研通智能强力驱动
Strongly Powered by AbleSci AI