作业车间调度
计算机科学
数学优化
局部搜索(优化)
组分(热力学)
缩小
计算
工作车间
算法
流水车间调度
数学
布线(电子设计自动化)
计算机网络
热力学
物理
作者
Jie Zhu,Xiaoping Li,Qian Wang
标识
DOI:10.1016/j.ejor.2008.09.015
摘要
In this paper, no-wait job shop problems with makespan minimization are considered. It is well known that these problems are strongly NP-hard. The problem is decomposed into the sequencing and the timetabling components. Shift timetabling is developed for the timetabling component. An effective method, CLLM (complete local search with limited memory), is presented by integrating with shift timetabling for the sequencing component. Experimental results show that CLLM outperforms all the existing effective algorithms for the considered problem with a little more computation time.
科研通智能强力驱动
Strongly Powered by AbleSci AI