堰
流量(数学)
大洪水
频道(广播)
流动条件
水文学(农业)
地质学
岩土工程
明渠流量
构造盆地
环境科学
机械
工程类
地貌学
地理
电信
物理
考古
地图学
作者
Un Ji,Seojun Kim,Byungman Yoon,Sanghyuk Kim
出处
期刊:Journal of Irrigation and Drainage Engineering-asce
[American Society of Civil Engineers]
日期:2013-03-06
卷期号:139 (8): 663-671
被引量:7
标识
DOI:10.1061/(asce)ir.1943-4774.0000610
摘要
To design the off-stream detention basin by the sides of rivers or channels, flood-level reduction in main channels should be evaluated under unsteady flow. Flow discharge diverted to the side weir from the main stream can be calculated practically by the standard weir or lateral weir equations. In this study, experimental and numerical modeling with a side-weir detention basin was conducted for unsteady flow. The experimental results were compared with the numerical backwater profile calculation considering the water discharge overflowed into the basin from the channel. The overflowed discharge was estimated by the standard weir and lateral weir equations for various flow types at the side weir. The standard weir equation accurately predicted flow discharge diverted to the side weir for free overflow condition. The lateral weir equation calculated a precise flood level and time of peak flow for the condition modeled, especially when the various flows, including free and submerged overflows, were developed at the side weir.
科研通智能强力驱动
Strongly Powered by AbleSci AI