成本估算
计算机科学
综合后勤保障
架空(工程)
学习效果
成本动因
运筹学
运营管理
工业工程
业务
工程类
系统工程
营销
经济
微观经济学
操作系统
作者
Sangjun Ahn,Mohammed Sadiq Altaf,SangUk Han,Mohamed Al‐Hussein
摘要
Logistics operations in panelized construction are vital daily tasks that connect the panel manufacturing facility to the job site. Although logistics operations are both important and prevalent in panelized construction, the cost of logistics has yet to be fully understood by either industry or academia due to the complicated relationship between multiple factors in logistics demands and operations. In practice, logistics is considered as an overhead cost that consists of various indirect or fixed costs in the panelized construction operation. As a result, logistics cost estimates are rendered inaccurate when subjected to project changes. Considering the number of construction projects over the course of a year, inaccurate logistics cost estimates are significant. Previous studies have shown that a machine learning approach could be used to predict costs that are influenced by multiple factors. To fill knowledge gaps in both research and practice, in this study machine learning based on historical logistics data is used to accurately predict logistics costs for a given project. The results from this study indicate that machine learning can be a reliable tool to predict logistics costs.
科研通智能强力驱动
Strongly Powered by AbleSci AI