地铁列车时刻表
调度(生产过程)
计算机科学
作业车间调度
数学优化
运筹学
资源限制
项目管理
集合(抽象数据类型)
工程类
数学
系统工程
分布式计算
操作系统
程序设计语言
作者
Hongyan Ding,Cunbo Zhuang,Jianhua Liu
标识
DOI:10.1016/j.autcon.2023.104958
摘要
The resource-constrained project scheduling problem (RCPSP) aims to schedule a set of activities subject to resource and precedence constraints to minimize the project makespan. The construction schedule optimization is modeled and solved as the RCPSP, and research on the RCPSP has had a positive impact on construction projects. However, given the narrow assumptions of the standard RCPSP model, it fails to capture many practical engineering requirements. Consequently, various extended problems and more competitive solutions have been developed. However, few studies have discussed the extensions of the RCPSP and corresponding optimization algorithms. This paper reviews the literature on project scheduling over the last decade. First, the standard RCPSP is described, and extended models are summarized based on objectives, constraints, and activities. Then, the research progress of the algorithm and other variants of the RCPSP are investigated. Finally, based on statistics obtained previously, current limitations, challenges, and future research directions are discussed.
科研通智能强力驱动
Strongly Powered by AbleSci AI