组分(热力学)
约束(计算机辅助设计)
集合(抽象数据类型)
涡轮机
运筹学
计算机科学
平面图(考古学)
发电机(电路理论)
可靠性工程
数学优化
最佳维护
运营管理
工程类
数学
考古
程序设计语言
功率(物理)
物理
热力学
历史
机械工程
量子力学
作者
Fatemeh Safaei,Jafar Ahmadi,Mitra Fouladirad
标识
DOI:10.1080/00207543.2022.2120107
摘要
This paper proposes a maintenance policy for a k-out-of-n: F system operating to fulfil several jobs without interruptions. The system is replaced when the Nth job completes or at the kth failure, whichever occurs first. So, there are some non-failed components when a replacement is done. These components can be sold as second-hand products to continue working in other systems for a while. The price of them is also considered in the proposed maintenance policy. An optimal maintenance policy is studied to minimise long-run average cost under the constraint of relative mean operating time. Comprehensive numerical studies are done to assess the effect of the model parameters on the optimal solutions. Also, to demonstrate the applicability of the proposed plan, a data set related to wind turbine generator failures is considered as a case study.
科研通智能强力驱动
Strongly Powered by AbleSci AI