微电网
分类
聚类分析
计算机科学
节点(物理)
模糊逻辑
数学优化
工程类
数学
算法
人工智能
控制(管理)
结构工程
作者
Chang‐Yun Wang,Xiaohu Guan,Haiying Dong,Siyuan Zheng
标识
DOI:10.1109/icsgsc59580.2023.10319168
摘要
The interconnected location of the microgrid is related to the stable operation of both the distribution network and microgrid. This paper used the sitting of microgrid as a foothold to reduce the impact of voltage deviation and network loss after microgrid connection to the distribution; a method on the interconnected location of the microgrid based on multiobjective decision is proposed. This method synthetically considers the voltage deviation, network loss, voltage improvement level, network loss improvement level and static voltage stability index after the microgrid is connected to the distribution network. First, the microgrid is respectively connected to each candidate node in the distribution network system, and the five selected indexes of each node are calculated according to the power flow. Then, by constructing the ideal optimal object and the ideal worst object, the candidate nodes are divided into three categories by means of fuzzy clustering. The Euclidean distance method is then used to further refine the clustering results to realize the sorting of the candidate nodes. Finally, the accuracy and rationality of the sorting results are verified by the simulation results of a typical microgrid connected to an IEEE14 distribution network.
科研通智能强力驱动
Strongly Powered by AbleSci AI