钻孔
地质学
钻探
熵(时间箭头)
石油工程
计算机科学
岩土工程
工程类
量子力学
机械工程
物理
作者
Wei Qi Yan,Wan‐Huan Zhou,Ping Shen
出处
期刊:Geo-Risk 2017
日期:2023-07-20
卷期号:: 86-93
标识
DOI:10.1061/9780784484975.010
摘要
Borehole drilling has been regarded as a traditional way of obtaining geological information in site investigation, while the borehole locations are difficult to be determined. Since increasing the number of boreholes requires additional expenditure, the optimization of borehole locations considering stratigraphic uncertainty has been crucial for sustainable development. In this study, a borehole planning strategy is proposed considering updated 3D stratigraphic uncertainty distribution, which is determined by a stratum-informed random field-based method, site division approach, and information entropy. Several sub-sites are generated based on the neighboring boreholes, enabling the site-specific uncertainty to be evaluated and compared. The optimized borehole location is the center of the sub-site presenting the highest average entropy. The effectiveness of the proposed strategy is verified through a three-layer geological model and compared with the traditional borehole planning strategy. The results have shown that the proposed strategy effectively decreases the information entropy and increases the accuracy.
科研通智能强力驱动
Strongly Powered by AbleSci AI