端口(电路理论)
业务
综合项目交付
收入
交通基础设施
财务
运输工程
鉴定(生物学)
私营部门
环境规划
项目管理
工程类
经济增长
经济
环境科学
电气工程
系统工程
植物
生物
作者
Elton De Jesus Rock,Shulian Wu
标识
DOI:10.1088/1755-1315/474/4/042001
摘要
Abstract Recently, Public Private Partnerships (PPP) in Mozambique has demonstrated significant advances in the level of private sector involvement in the delivery of infrastructure such as railways and port assets. It is generally considered that PPP is a mechanism to simplify the delivery of transportation projects, transfer the risks of transportation projects, reduce transportation costs and increase transportation revenue. This paper introduces a framework that identifies the risks associated with PPP arrangements for Railway and Port project delivery in Mozambique, with special attention to the Nacala corridor project. The framework divides risks into four categories: political, economic, socio-cultural, and technical (referred to as PEST), which can help project managers launch PPP projects to identify risks, manage risks, and minimize project risks.
科研通智能强力驱动
Strongly Powered by AbleSci AI